Policy Issue
Select...
Date range
Sort
Search
05 January 2021

European Roadmaps and Consultations (GEN – 1192.00)

<p>The European Consultations start with a ‘Roadmap/Inception Impact Assessment’ followed by a ‘Public Consultation’. The Roadmap looks for general comments of the interested persons and stakeholders. The Consultation is the second phase and consists of detailed questionnaires. The industry benefits from responding to these Consultations.</p>
04 January 2021

Notes from final stakeholder meeting on ENER Lot 38

The second stakeholder meeting on the preparatory study for Building Automation and Control Systems (BACS) was held on 15 December 2020. The study team presented and discussed the deliverables. The proposed Ecodesign requirements for control systems are made separately at the packaged product level and at the installed product level. Written comments on the proposal may be submitted until 19 January 2021.
04 January 2021

Preparatory study for Building Automation and Control Systems (GEN – 1191.00)

<p>The second stakeholder meeting on the preparatory study for Building Automation and Control Systems (BACS) was held on 15 December 2020. The study team presented and discussed the deliverables. The proposed Ecodesign requirements for control systems are made separately at the packaged product level and at the installed product level. Written comments on the proposal may be submitted until 19 January 2021.</p>